Home/Answers/Ducted
HEAT PUMP COST LAB / Ducted

After Ducted Processing

After Ducted, spot-check the output, then decide whether to delete/archive the original; keep a backup.

Updated 2026-11-01About 3 minLocal test
Quick answer

After Ducted, spot-check the output, then decide whether to delete/archive the original; keep a backup. Ducted depends on ducts/insulation/leakage.

Why it matters

A backup lets you roll back if the output is wrong.

Ducts.

Step by step

  1. Check area/insulation/ducts/climate/electrical capacity.
  2. Separate equipment/install/electrical/ducts/permits.
  3. Check rebates/tax credits/financing.
  4. Get 2-3 quotes; confirm model/warranty.

Common mistakes

  • Equipment price only, not install/electrical.
  • Ignoring ducts/insulation/climate.
  • Not checking rebates/credits.
  • No model/warranty terms.

Checklist

  • Area/insulation/ducts/climate/electrical.
  • Equipment/install/electrical/permits.
  • Rebates/credits/financing.
  • Model/warranty/payment.
  • Budget/maintenance/backup.

Key facts

  • Ducts.
  • Insulation.
  • Leakage.

FAQ

What should I do after Ducted?

After Ducted, spot-check the output, then decide whether to delete/archive the original; keep a backup. Ducted depends on ducts/insulation/leakage.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: EnergyStar