Home/Answers/Permits
HEAT PUMP COST LAB / Permits

Does Permits Upload Files?

This Permits processing runs locally and does not upload; browser extensions can still read the page.

Updated 2026-11-01About 3 minLocal test
Quick answer

This Permits processing runs locally and does not upload; browser extensions can still read the page. Electrical/mechanical/placement may need permits.

Why it matters

Local processing reduces upload risk but is not absolute security.

Electrical.

Step by step

  1. Check area/insulation/ducts/climate/electrical capacity.
  2. Separate equipment/install/electrical/ducts/permits.
  3. Check rebates/tax credits/financing.
  4. Get 2-3 quotes; confirm model/warranty.

Common mistakes

  • Equipment price only, not install/electrical.
  • Ignoring ducts/insulation/climate.
  • Not checking rebates/credits.
  • No model/warranty terms.

Checklist

  • Area/insulation/ducts/climate/electrical.
  • Equipment/install/electrical/permits.
  • Rebates/credits/financing.
  • Model/warranty/payment.
  • Budget/maintenance/backup.

Key facts

  • Electrical.
  • Mechanical.
  • Placement.

FAQ

Does Permits processing upload my files?

This Permits processing runs locally and does not upload; browser extensions can still read the page. Electrical/mechanical/placement may need permits.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: EnergyStar